Title:
|
Contract agreement between Wilmer Waldo and John H. Blair Co. Incorporated, June 19, 1911 |
|
Author:
|
Waldo, Wilmer
|
|
Description:
|
John H. Blair Co. Incorporated was contracted to do all work necessary in excavating earth from the trenches preparatory to building tunnels "C" and "D", and the Water and Oil Tanks at the Rice Institute. |
|
Citation:
|
Waldo, Wilmer. (1911). "Contract agreement between Wilmer Waldo and John H. Blair Co. Incorporated, June 19, 1911." |
|
Citable link to this page:
|
http://hdl.handle.net/1911/12973 |
|
Date:
|
1911-06-19 |